Psykologi & pedagogik
Pocket
Analysis of the Effect of Centralizing Management of Mobility Readiness Spares Package Assets
Ian R Hester
889:-
Uppskattad leveranstid 7-12 arbetsdagar
Fri frakt för medlemmar vid köp för minst 249:-
Current Air Force supply doctrine requires the management of large numbers of spare parts in Mobility Readiness Spares Packages (MRSPs). The MRSPs are usually designed to support deployed aircraft for the first 30 days of a conflict, and can be quite large. When units from several bases deploy to the same operating location, they each bring their full MRSP. This results in a large logistics footprint that may be reduced by taking a system-level approach. This thesis examined the impact of centralized MRSP management on kit size and cost. The Aircraft Sustainability Model (ASM) computer program was used to evaluate MRSPs for F-15C, C-17A, and B-52H aircraft deploying in both the traditional manner and with customized MRSPs from a centralized facility.
- Format: Pocket/Paperback
- ISBN: 9781288324804
- Språk: Engelska
- Antal sidor: 78
- Utgivningsdatum: 2012-11-21
- Förlag: Biblioscholar