Samhälle & debatt
Pocket
Construction Scheduling, Cost Optimization and Management
Hojjat Adeli • Asim Karim
1269:-
Uppskattad leveranstid 10-16 arbetsdagar
Fri frakt för medlemmar vid köp för minst 249:-
Andra format:
- Inbunden 3709:-
Construction Scheduling, Cost Optimization and Management presents a general mathematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.
- Format: Pocket/Paperback
- ISBN: 9780367863807
- Språk: Engelska
- Antal sidor: 338
- Utgivningsdatum: 2019-12-12
- Förlag: Taylor & Francis Ltd