Samhälle & debatt
Pocket
Insights on Aircraft Programmed Depot Maintenance
Adam C Resnick • Elvira N Loredo • Richard J Hillestad • Edward Geoffrey Keating
259:-
Tillfälligt slut online – klicka på "Bevaka" för att få ett mejl så fort varan går att köpa igen.
This technical report describes the F-15 programmed depot maintenance (PDM) process as performed at the Warner Robins Air Logistics Center (WR-ALC) in FYs 2004-2006. The average WR-ALC F-15 PDM visit runs behind schedule and lasts about four months. Also, PDM can wait a long time for parts; aircraft move through PDM steps out of sequence, with missing parts catching up with the aircraft when they become available, or cannibalize other aircraft.This technical report describes the F-15 programmed depot maintenance (PDM) process as performed at the Warner Robins Air Logistics Center (WR-ALC) in FYs 2004-2006, assessing PDM duration and the challenges the process faces.
- Format: Pocket/Paperback
- ISBN: 9780833042989
- Språk: Engelska
- Antal sidor: 38
- Utgivningsdatum: 2008-08-08
- Förlag: RAND