2179:-
Uppskattad leveranstid 10-16 arbetsdagar
Fri frakt för medlemmar vid köp för minst 249:-
Andra format:
- Pocket/Paperback 669:-
First published in 1997, this volume joined the debate assessing the potential of the Just-In-Time management philosophy from the manufacturing industry for Singapores construction industry by examining the "off-site" prefabrication of precast concrete components in Singapore, in comparison with traditional management systems. In the wake of the 1991 Strategic Economic Plan of Singapore, which forecasted alarmingly low productivity in the local construction sector, the authors noted that construction in Japan was 35% more productive, whilst Finland was 75% better. Highlighting immense potential for the JIT approach, they explore the JIT philosophy, traditional systems, construction wastes and comparisons between construction and manufacturing.
- Format: Inbunden
- ISBN: 9781138327689
- Språk: Engelska
- Antal sidor: 250
- Utgivningsdatum: 2018-09-18
- Förlag: Routledge