bokomslag Project Scheduling with Time Windows and Scarce Resources
Data & IT

Project Scheduling with Time Windows and Scarce Resources

Klaus Neumann Christoph Schwindt Jrgen Zimmermann

Inbunden

2249:-

Funktionen begränsas av dina webbläsarinställningar (t.ex. privat läge).

Uppskattad leveranstid 10-16 arbetsdagar

Fri frakt för medlemmar vid köp för minst 249:-

Andra format:

  • 385 sidor
  • 2003
A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed in the second edition.
  • Författare: Klaus Neumann, Christoph Schwindt, Jrgen Zimmermann
  • Illustratör: 180 Abb
  • Format: Inbunden
  • ISBN: 9783540401254
  • Språk: Engelska
  • Antal sidor: 385
  • Utgivningsdatum: 2003-06-01
  • Förlag: Springer-Verlag Berlin and Heidelberg GmbH & Co. K