bokomslag Tunnelling. A Decade of Progress. GeoDelft 1995-2005
Vetenskap & teknik

Tunnelling. A Decade of Progress. GeoDelft 1995-2005

Adam Bezuijen Haike Van Lottum

Inbunden

1529:-

Funktionen begränsas av dina webbläsarinställningar (t.ex. privat läge).

Uppskattad leveranstid 7-12 arbetsdagar

Fri frakt för medlemmar vid köp för minst 249:-

  • 302 sidor
  • 2005
Following years of research, the first bored tunnel in soft soil in the Netherlands, the Tweede Heinenoord tunnel, was completed in 1998. Since then, Dutch engineers have increased their knowledge of soft soil tunnelling, with a significant and important part of this research being carried out by GeoDelft, the Dutch National Institute of Geo-Engineering. This book contains the most important publications by GeoDelft on the subject of soft soil tunnelling, focusing on the period from 1992 to the present, it is divided into four main headings: field measurements; grout behaviour; model testing; and numerical analysis. This impressive overview of the progress made in the Netherlands in soft soil tunnelling research over more than a decade is a valuable resource to those working in soft soil tunnelling worldwide.
  • Författare: Adam Bezuijen, Haike Van Lottum
  • Illustratör: Illustrations
  • Format: Inbunden
  • ISBN: 9780415391337
  • Språk: Engelska
  • Antal sidor: 302
  • Utgivningsdatum: 2005-12-01
  • Förlag: CRC Press